section Podvis-Preseka
Earthworks: 3.000.000 m3 Excavation with construction of Slopes (Total 17 cuts) 50% of the quantity with Drilling and Blasting
Structures: Total - 11 Viaducts, length from 65 m to 300 m and height from 22 m to 53 m Concrete : 63.500 m3, Reinforcement : 7.300.000 kg
Sinohydro Corporation Limited, Beijing
Macedonia
List of performed construction works